by AussieBoy » February 9, 2009, 9:14 pm
The home sits on 600mt2 block, there is 20 mts to the back fence, so It was possible to build behind the house a shed, but that would cut down the back yard by 5 mts, with the pond in the back yard 15mt long 5 mt wide, I wanted to keep as much yard for trees a I can, and you catch a better breeze when the home is lifted up higher.
The cost to lift was B7500 for the crane, b400 for the welder, and b5000 for the steel columns, B7000 for the colourbond wall sheets and back door, B2800 for labour to reassemble home to lock up stage, Plus B25,000 for a remote rolla door, which will be fitted later, B2000 for crusher dust base. slab at later date approx B10,000
Total cost B60,000 6 x 4 mt =24mt2 = B2500 a mt2 cheap cheap, right up LAs ally
If I built behind the home I would have lost a bedroom window, and not as good as breeze,